Review No:2 , ALUS DESCRIPTION := DPW ROAD ENGINEERING
Employee ID =RARON
The driveway should be perpendicular to the road and 24 feet in width. The driveway should be paved up to the property line and base rock is required for the parking area.The revised driveway will likely require the extension of a culvert. It is recommended that additional parking spaces be provided on the other side of the storage container near the road. The parking and turnaround areas should be laid out so that a buffer exists around the storage container and outside display.Review No:1 , ALUS DESCRIPTION := DPW ROAD ENGINEERING
Employee ID =RARON
NO PROJECT REVIEW DESCRIPTION AVAILABLE
|